Using Work Factor Method with the MOST System for Accurate Disassembly Time Evaluation

Jean Bosco SAMON1

1

Publication Date: 2021/12/24

Abstract: Rapid disassembly of components is required in various contexts such as repair, remanufacturing, and recycling. Work Factor Method illustrates a good sequence of disassembly activities which is very heavy to implement. That is why it is intended to interpret this sequence with the MOST system. Therefore by applying a globally known work evaluation system MOST (Maynard's Operation Sequence Technique) in a Work Factor Disassembly Sequence, we obtain a standard pattern of evaluating Disassembly sequences time based on MOST principles. The implementation of the Work factor Sequence with the MOST system gives more accurate disassembly time than using the Work Factor Methodonly. The combination of these two techniques helps with time accuracy definition and therefore can increase product life-cycle quality.

Keywords: MOST system, Work Factor Method Sequence, Disassembly, Modelling.

DOI: No DOI Available

PDF: https://ijirst.demo4.arinfotech.co/assets/upload/files/IJISRT21NOV686.pdf

REFERENCES

No References Available