Abstract: Power plant overhaul activities aim to maintain the reliability of power plants. All parties involved in this overhaul activity must be able to work dynamically to support the achievement of overhaul performance that is on time, on cost, on quality, on scope, on clean, and on safety (6 ON). Therefore, risk analysis and mitigation are needed in the process of procurement of goods and services for power plant overhaul so that it can assist companies in making decisions. Multi-Criteria Decision-Making (MCDM) method, especially the Analytic Network Process (ANP) method to obtain the weight of risk agents that affect the occurrence of a risk (risk event). House of Risk (HOR) method for risk identification, analysis and mitigation. The results of this study show that there are 12 types of risks with 18 risks caused by 20 risk causes.

Keywords: Analytic Network Process (ANP); House of Risk (HOR); Risk Management; Overhaul.

DOI: https://doi.org/10.5281/zenodo.10499904

PDF: https://ijirst.demo4.arinfotech.co/assets/upload/files/IJISRT24JAN319.pdf

REFERENCES

No References Available