Publication Date: 2023/07/12
Abstract: Large-scale building construction projects are carried out to meet community needs. Required a serious management in achieving the desired goals and results. However, in practice, building construction failures are still encountered due to implementation that is not following established procedures and quality standards. An evaluation is needed regarding the importance and application of components of construction work in improving the expected quality of work. The purpose of this study is to compile a mapping and performance assessment of the quality of building construction implementation and to provide an evaluation related to the implementation of building construction work. Data collection was carried out by conducting a questionnaire survey where the respondents in this study were people who were directly involved in the implementation of building construction. Analysis of the data used in this research uses IPA analysis to find out the results of mapping related to the level of importance and application of building construction work components and SWOT analysis to formulate the evaluation that needs to be carried out. As a result of the research, the IPA analysis shows that the majority of building construction work components have a high level of importance and applicability. And for the results of the evaluation that can be done is to check the work materials, work methods, and shop drawings on building construction.
Keywords: Quality of work, Building Construction, IPA Method, SWOT Method, Component of Work.
DOI: https://doi.org/10.5281/zenodo.8138307
PDF: https://ijirst.demo4.arinfotech.co/assets/upload/files/IJISRT23JUL255.pdf
REFERENCES