Designing of Load Response Generation Synchronized 15MW Hydropower Station and Simulation Based Electromechanical and Structural Analysis

H.D.Milan Ravinath Perera1

1

Publication Date: 2020/04/10

Abstract: Hydropower station development is mainly based on the reservoir type and its available head. Therefore, this paper was written on basis of how to design a 15MW Hydropower Station considering environmental factors, civil concerns and electromechanical integrations. This paper discuss the most important design arguments under construction of the specific 15MW small hydropower station structure and its mathematical modellings. It was used MatLab/Simulink, SolidWorks, and ANSYS software tools to observe its simulation results. The hydropower system will be changing its generation as the load requirement deviates and the author contributed the load response power generating system design in this paper.

Keywords: Hydropower, Civil Structure, Electromechanical, PID Governor control, Excitation.

DOI: No DOI Available

PDF: https://ijirst.demo4.arinfotech.co/assets/upload/files/IJISRT20APR137.pdf

REFERENCES

No References Available