Contractor Selection Method for Construction Work and its Effect in Nepal

Er. Bishnu Prasad Khanal1

1

Publication Date: 2019/12/21

Abstract: The construction industries are one of the major parts that give important components for the improvement of on economy. The construction industries are the scheme through which a general public achieves its objective of urban and country development project. Construction Industry has the greatest challenges to complete the work on Time in Nepal now. There are several causes behind these days, which thus influences the project implementation at massive in the general world, including in Nepal. This study expected to notice and break down the one reason for delays in construction work in Nepal. The procedure of the procurement of works and selection method of construction contractor is also one of the causes of delay construction work in Nepal. In Nepal, Constructor selection is decided according to the lowest financial bidding system among the pre-qualified contractor. It is called low bid method. From this method, we will get financially benefit at starting time but we will get more difficult later to complete the project on time. Some country is precise average bid method. The contractor whose bid price is nearest to the average of all bidders is selected for construction of works. Some Country is followed by multi-criteria evaluation method. In this method, Contractor is selected according to some of the total weightiness from the Technical proposal and financial proposal. Technical and Financial proposal are evaluated in separate and combine the mark together to find out the highest scoring contractor. To eliminate the drawback of low bid system in Nepal, I have suggested using the Multi-criteria evaluation system after modified according to our condition in Nepal.

Keywords: Construction, Contractor, Bid, Nepal, Procurement.

DOI: No DOI Available

PDF: https://ijirst.demo4.arinfotech.co/assets/upload/files/IJISRT19DEC370.pdf

REFERENCES

No References Available