Analysis of Internal Factors Causing Delays in Jabodebek LRT Project

M. Alfons Kurniawan; Tjokro Hadi; Suwarto; Leily Fatmawati; Arief Subakti Ariyanto; Supriyadi1

1

Publication Date: 2022/08/24

Abstract: Light Rail Transit (LRT) is a rail-based accommodation project that started in 2015. During the implementation process, this project faced internal problems which caused delays in the completion process. Therefore, the purpose of this study is to determine the internal factors that cause delays in related projects. The population of this research is the project field staff and the sample is taken using the saturated sample method where the entire population in this study is the sample. The analytical method used in this study is the Structural Equation Modeling (SEM) method. The results obtained from this study indicate that the internal factors causing the delay in the LRT project are Factor 1: Labor, Factor 2: Material, Factor 3: Equipment, Factor 4: Finance.

Keywords: Internal; Lateness; SEM; Project

DOI: https://doi.org/10.5281/zenodo.7017899

PDF: https://ijirst.demo4.arinfotech.co/assets/upload/files/IJISRT22AUG448.pdf

REFERENCES

No References Available