A PHP Error was encountered

Severity: Warning

Message: get_headers(): This function may only be used against URLs

Filename: views/page_view.php

Line Number: 499

A PHP Error was encountered

Severity: Warning

Message: array_change_key_case() expects parameter 1 to be array, boolean given

Filename: views/page_view.php

Line Number: 499

Examination of Cost Overrun in Highway Projects Using Artificial Neural Networks in Kerala


Authors : Shemi,S,N" Asok Kumar N

Volume/Issue : Volume 5 - 2020, Issue 3 - March


Google Scholar : https://goo.gl/DF9R4u

Scribd : https://bit.ly/2XRxhCZ


Abstract : The trend of cost overrun in highway projects is one of the major challenge faced by the government since time immemorial. There has been many factors which results in providing a positive as well as negative impact to this phenomenon. The purpose of this paper is to determine the causal causes of cost escalation of highway projects in Kerala and in turn develop Regression models and neural network models for analysis of cost overrun for the future projects.

Keywords : Cost overrun, Regression, Artificial Neural Network (ANN)

The trend of cost overrun in highway projects is one of the major challenge faced by the government since time immemorial. There has been many factors which results in providing a positive as well as negative impact to this phenomenon. The purpose of this paper is to determine the causal causes of cost escalation of highway projects in Kerala and in turn develop Regression models and neural network models for analysis of cost overrun for the future projects.

Keywords : Cost overrun, Regression, Artificial Neural Network (ANN)

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe