A PHP Error was encountered

Severity: Warning

Message: get_headers(): This function may only be used against URLs

Filename: views/page_view.php

Line Number: 499

A PHP Error was encountered

Severity: Warning

Message: array_change_key_case() expects parameter 1 to be array, boolean given

Filename: views/page_view.php

Line Number: 499

Complexities of Cost Overrun in Construction Projects


Authors : Parnika Singh Yadav, Dr. Virendra Kumar Paul

Volume/Issue : Volume 5 - 2020, Issue 2 - February


Google Scholar : https://goo.gl/DF9R4u

Scribd : https://bit.ly/2TsLF21


Abstract : The cost of construction projects right from the inception to completion stage is becoming a matter of great concern, recently, especially among clients and beneficiaries, because of the rising interest rates, scope change, among other factors responsible for cost overruns. Hence the need to understand the complexities of cost overrun in the construction sector has become more important. This study therefore aims to identify the major complexity attributes of cost overruns in construction projects to suggest practical solutions in addressing them. Literature study along with semi- structured interview is used to identify the complexities of cost overrun and on the basis of the self-assessment tool maturity level of the complexity attributes, the major attributes behind cost overrun are identified based on the results of the analysis and further suggestive measures are given.

Keywords : Complexity, Cost Overrun, Self-Assessment Tool.

The cost of construction projects right from the inception to completion stage is becoming a matter of great concern, recently, especially among clients and beneficiaries, because of the rising interest rates, scope change, among other factors responsible for cost overruns. Hence the need to understand the complexities of cost overrun in the construction sector has become more important. This study therefore aims to identify the major complexity attributes of cost overruns in construction projects to suggest practical solutions in addressing them. Literature study along with semi- structured interview is used to identify the complexities of cost overrun and on the basis of the self-assessment tool maturity level of the complexity attributes, the major attributes behind cost overrun are identified based on the results of the analysis and further suggestive measures are given.

Keywords : Complexity, Cost Overrun, Self-Assessment Tool.

Never miss an update from Papermashup

Get notified about the latest tutorials and downloads.

Subscribe by Email

Get alerts directly into your inbox after each post and stay updated.
Subscribe
OR

Subscribe by RSS

Add our RSS to your feedreader to get regular updates from us.
Subscribe