Abstract :
Overall Equipment Effectiveness (OEE) is an
indicator to assess the utilization of machinery. This
paper's primary goal is to identify and solve the loss
elements to enhance the Performance efficiency & Man
time. This study aimed at carrying out Gemba walk in the
industrial set up to analyse the problems faced by the
machine operator and continuous improvement solutios
were suggested for the performance enhancement.
Overall Equipment Effectiveness (OEE) is an
indicator to assess the utilization of machinery. This
paper's primary goal is to identify and solve the loss
elements to enhance the Performance efficiency & Man
time. This study aimed at carrying out Gemba walk in the
industrial set up to analyse the problems faced by the
machine operator and continuous improvement solutios
were suggested for the performance enhancement.